Polymeric Clad Plate (PCP)

PCP Installation Plan
1. Requirements for the foundation: The concrete foundation must be flat, and the height different should be less than 3mmwhen checked with a 2m straightedge. The concrete surface should be solid without dust emission, and the rate of water content at 5mm depth should be less than 6%.
2. Isolation layer solution:
Floor and ground (plane) can choose 1mm of FRP insulation layer
Ditches, pools and cells can choose 2-3mm FRP insulation layer
Equipment lining can also choose 2-3mm of FRP insulation layer
3. Installation method of PCP: Pave with PCP using PCP-special resin mastic and set aside joints. The indoor joint width is 2-3mm; the outdoor joint width is 8-12mm; for large area indoor paving, a 25mm expansion joint shall be set aside every 8-10 meters.
4. Completion quality: No bubbles in the paving mastic; clean, bright and flat surface; geight difference less than 2mm when checked with a 2m straightedge.
5. Barite plate are resistant to fluorine-containing medium (less than 1.5%).