VANADIUM CATALYST

CHMM provides integrated services for the sulfuric acid industry, including sulfuric acid catalyst products, automatic catalyst screening, spent catalyst recycling, and detection and analysis of sulfuric acid plant operations, among others.

The CHP and VCs series are high-performance catalystsdesigned for sulfur dioxide oxidation throughout thesulfuric acid process.

The unique manufacturing processes enable CHP and VCs products to retain the complete diatom structure, allowing active ingredients to penetrate and distribute evenly in the micropores of the diatom

Features

▶ CHP catalyst series

Apperance

Shape

Daisy

Diameter (/O) (mm)

10-12 / 3.5-4mm

Length (mm)

12 - 17 mm

Color

Yellow → Deep or Pale Green

Physical Properties

Particulate Strength (N/cm)

≥ 40N/cm

Ball MillHardness (%)

≤ 5%

Composition

Vanadium Pentoxide (weight O)

≥ 7.3

Ignition temperature

(℃)

410 ℃

Activity

SOz corversion rate (%) @485℃

≥ 87%

▶ VC catalyst series

Apperance

Shape

Daisy

Diameter (/O) (mm)

10-12 / 3.5-4mm

Length (mm)

12 - 17 mm

Color

Yellow → Deep or Pale Green

Physical Properties

Particulate Strength (N/cm)

≥ 40N/cm

Ball MillHardness (%)

≤ 5%

Composition

Vanadium Pentoxide (weight O)

≥ 6.3%

Cs₂O(weight %)

≥7%

Ignition temperature

(℃)

380 ℃

Activity

SO₂ corversion rate (%) @390℃

≥ 26%

SO₂ corwersion rate(%) @410℃

Benefits

- Lower initial investment

- Longer service life (8-15 years)

- Wider screening interval (3-5 years)

- Reduced screening loss (less than 5%)

Applications

- CHP Series: Sulfuric acid facilities with various raw materials, capacities, and processes operate at temperatures ranging from 410℃ to 630℃. It can be applied to any bed in the 3+1 or 3+2 processes, with optimal performancein the first, second, and third beds.

- VC Series: It is suitable for acid production systems with various raw materials, capacities, and processes. It is primarily used in the final stage of the first bed in the single absorption process, and in both the final stage of the first bed and the last bed in the double absorption process. The operating temperature rangesfrom 370 to 550℃.

FAQs

01
Payment Method
T/T 30% as deposit, and 70% before delivery
02
Packaging Method
The CHP and VCs series are packaged withan inner plastic liner and an outer fiberboard barrel or metaldrum, available in 50Lor 200 Lsizes.
03
Quality guaranteed
1 Years.
04
Delivery
It will be delivered within 15 working days after fullpayment is received.
05
Sample Policy
We can supply free samples on a freight-collectbasis
Name
Company Name
Contact Number
Topic
Email
Comment
验证码
Submit